Guaranteed water discovery, wherever you are.

We find water. The clearest water on the planet.

How is Aqva World Different?

We find water where other companies fail, and will tell you that it's impossible

The water we find is not groundwater it’s Artesian water. Artesian water is not dependent on rainfall. Using this water does not deplete the natural groundwater level.

The quality of the water we find is far higher than the quality of groundwater. It does not contain any nitrates, bacteria or any other harmful contaminants.

After carrying out market research, we can confidently say that AQVA WORLD is the only company that charges only upon the successful discovery of the water.

Guaranteed water discovery We find artesian water, the clearest water on the planet.

  • Our discovery success rate is 100%
  • With our unique method, it only takes us 2 days to find the precise coordinates of underground water sources.
  • We are able to find water where others have given up.
  • We can find water anywhere: granite mountains, barren deserts – you name it, we will find water there.
  • The water sources we locate are not groundwater supplies. Our sources do not depend on weather conditions or the seasons.
  • Using our water source does not decrease the natural groundwater levels.
  • The quality of our water is as good as the best mineral water you can buy in a supermarket.
  • Water sources found with our method maintain constant volume all year round. From our experience, water levels in the sources we find do not change for many years.
Our success rate of artesian water discovery is 100%

Our success rate of artesian
water discovery is 100%

Our Method

Cracks form in the Earth’s crust and through them, liquid and gaseous substances find their way to the surface, as well as water that has been synthesized in the Earth’s core.

Drilling into the centre of these cracks releases the water.

Our method is unique because we know how to find the water-bearing cracks (zones of tectonic disturbance) and determine their coordinates with the necessary accuracy.

Discovery methodology

Discovery methodology

Procedure

We find water using our unique technology which combines scientific research, software and hardware tools. This know-how guarantees that we find water in 100% of cases.

The search for water has two stages:

1. Field stage.Probably the most interesting part of our research is conducting field exploration. Here we use our technology to find water sources.

2. Laboratory Stage.In this stage we do a mathematical evaluation of the results from the Field Stage. We are then able to calculate the exact location of where to drill the boreholes and at what depth we will find water.

Our Guarantee

The water discovery and drilling industry is known for its risks, which give rise to a fear of failure. This is why companies will always present you with a huge bill, regardless of the results.

At Aqva World, our solid experience and in-depth expertise mean we can work with our customers on the following model – you pay only if we find water.

Moreover, we guarantee that the water sources we discover will yield no less than 100 000 litres a day or no less than 90% of the capacity we forecast before we start drilling.

As a long-term back up, we also guarantee water source capacity. If the capacity of the source we discover drops by more than 30% within 3 years of its discovery, we will either re-drill the borehole, or find a new point within a 1 kilometre radius of our first borehole.

Our projects

Project 1

Project No 1

Year:
2016
Client name:
Mitterfirmiansreut municipality
Country:
Bavaria, Germany
Location:
Granite, Hill

Case study: The previous company this customer worked with provided 4 dry boreholes, with an average depth of 118 meters on the top of the mountain. The forecasts received from other companies were also negative, and this almost led to customer quitting water search operations.

Outcome: The Aqva World team discovered a water source at the depth of 22 meters just 47 meters away from one of the previously drilled empty boreholes. Our new borehole provides the customer with 200 m3 of water daily.

Project No 2

Year:
2017
Client name:
Perlesroit Municipality
Country:
Bavaria, Germany
Location:
Granite, Hill

Case study: The customer had a dry, 67-meter-deep borehole. After receiving a negative forecast from one of the water mining companies, the customer was considering quitting the search for water.

Outcome: Our specialists discovered a water source at the depth of 17 meters, and just 25 meters away from the dry borehole. This provided the customer with a daily water supply of 175 m3.

Project No 3

Year:
2018
Client name:
Ulrichstein Municipality
Country:
Germany
Location:
Ulrichstein
Industry:
Agriculture

Case study: Starting from July 2018, the sources of groundwater catchment did not supply enough water, as a result, it was necessary to deliver daily up to 80 cubic meters of water by trucks. The city is located in a valley with a small river, which by the time has dried up and so did all the wells. On the border of the valley (about 60 meters above the valley) there is a catchment area of 40x100 meters. About 340 meters from it one unsuccessful drilling was carried out. 1600 meters from the water catchment, there is a deep borehole, left over from the geophysical year programs, where 12 years ago at a depth of 200 meters a valid water source was discovered. Currently, no water is detected there.

Goal: to find a water source with capacity 2.5 - 5 liters per second located as close as possible to the existing water catchment.

Outcome: After 2 days of searching, as Aqva World’s team forecasted, the first artesian water source was discovered 15 meters from the catchment, at the depth of 19 meters. Due to the difficult geological situation (basaltic rocks and tuffs), the cable-tool drilling method was used for drilling, which made the whole process slower than usual. Today the water borehole provides a daily water supply of 3 l / s. The borehole depth is 52 meters, the water level set on 17 meters. The 15-meter heated pipe is laid to the water catchment. After the winter period, we're planning to deepen the borehole, as deep as about 75-98 meters to achieve a water supply of 5 liters per second.

Project No 4

Year:
2018
Client name:
ЕximCo.,Ltd
Country:
Saudi Arabia
Location:
Desert
Industry:
Agriculture

Case study: After receiving a negative forecast form geologists and drilling company regarding the possible water sources in this location, the customer was considering quitting the water search operations.

Outcome: As per our team’s forecasts, the first artesian water source was found at the depth of 43 meters. The water borehole that provided a daily supply of 1000 m3 of water was discovered at the depth of 150 meters.

Working process

  • 1

    Preparation

    Signing agreement
    Calculating water demand
    Researching water logistics

  • 2

    Permits

    The customer obtains all necessary permits

  • 3

    Discovery

    Two dedicated on-site engineers define
    the position and depth of 2 drilling points.
    The process takes 2 days

  • 4

    Drilling

    The Client hires or otherwise provides required equipment.
    Drilling equipment capacity should be 300+ meters depth
    Drill diameter 300 mm,
    Air compressor technology
    The process takes 2 days

  • 5

    Audit

    Once water is detected,
    capacity is measured using pump tool
    and compared to the original forecast

  • 6

    Furnishing

    The Client provides the furnishing based on our requirements
    The process usually takes 2-3 days

Pricing / Partnership model

Note: Factors 1 and 2 are for our account. Factors 3 through 6 are for the client’s account

  1. Aqva World team travel and accommodation expenses.
  2. Research phase (requires 2 experts for 2 to 3 days)
  3. One-time success fee: This calculation is based solely on the volume supplied by the borehole on the first full day of operation. Factors affecting the success fee calculation are borehole location, the resources required and other factors. The success fee is calculated individually in each case.
  4. Drilling (equipment and personnel)
  5. Water source audit.
  6. Water source furnishing.

1,2 – at our own expence.
3 – paid by our client
4 – paid by our client
5 – paid by our client
6 – paid by our client

Thank you for your attention!
For any queries, please do not hesitate to contact us: